- System name: Shenyang Metro
- Native name: 沈阳地铁
- Operational Lines: 2
- Rapid transit lines: 2
- operators
- Name: Shenyang Metro Group Corp
Native name: 沈阳地铁集团
line: 1 and 2
Operational[]
Logo | Line | Termini | Year Opened | Newest Extension | Length (km) | Stations |
---|---|---|---|---|---|---|
Line 1 | Shisanhaojie — Limingguangchang | 2010 | 2010 | 27.80 | 22 | |
Line 2 | Putianlu — Quanyunlu | 2012 | 2018 | 31.88 | 26 | |
Line 9 | Nujianggongyuan — Jianzhudaxue | 2019 | 2019 | 29.0 | 22 | |
Line 10 | Dangxianghu — Zhangshabu | 2020 | 2020 | 27.2 | 21 |
Under Construction[]
Logo | Line | Termini | Construction Started | Planned Opening | Length (km) | Stations |
---|---|---|---|---|---|---|
Line 1 | Limingguangchang — Shiboyuandong | 2020 | 2025 | 16.15 | 10 | |
Line 2 | Quanyunlu — Taoxian Airport | 2019 | 2024 | 14.2 | 8 | |
Line 3 | Baomaxingongchang — Xintaijie | 2019 | 2025 | 41.27 | 30 | |
Line 4 | Zhengxinlu — Chuangxinlu | 2016 | 2022 | 34.13 | 23 | |
Line 6 | Yalujiangbeijie — Yingchunjie | 2020 | 2026 | 32.25 | 30 |
Complete System (2026)[]
Logo | Line | Termini | Year Opened | Newest Extension | Length (km) | Stations |
---|---|---|---|---|---|---|
Line 1 | Shisanhaojie — Shiboyuandong | 2010 | 2025 | 43.95 | 32 | |
Line 2 | Putianlu — Taoxian Airport | 2012 | 2024 | 46.08 | 32 | |
Line 3 | Baomaxingongchang — Xintaijie | 2025 | 2025 | 41.27 | 30 | |
Line 4 | Zhengxinlu — Chuangxinlu | 2022 | 2022 | 34.13 | 23 | |
Line 6 | Yalujiangbeijie — Yingchunjie | 2026 | 2026 | 32.25 | 30 | |
Line 9 | Nujianggongyuan — Jianzhudaxue | 2019 | 2019 | 29.0 | 22 | |
Line 10 | Dangxianghu — Zhangshabu | 2020 | 2020 | 27.2 | 21 |
Map[]